Below Are Some of Our Projects
Site — Opuama Export Line In Oml 40
Project Description— Urgent Repair/Clamping Of ‘nos. (10”) Leaking Points
Client—NPDC
Site — Opuama Delivery Line In OML 40
Project Description— Recovery and Evacuation Of Crude Oil From The Spillage
Client—NPDC
Site — Evwreni — UPS delivery line OML 30
Project Description—emergency epair works on the vandalized 12”
Evwreni — UPS delivery line OML 30
Project Duration— Job completed on scheduled and handed over to the
client.
Year Completed—2016.
Client—NPDC
Site — Otegele in OML-30
Project Description—Containment/Remediation rks On The Vandalized 28” Transforcados pipeline at Otegele in OML30
Project Duration—Job completed on scheduled and handed over to the
client.
Year Completed- 2016.
Client—NPDC
Site — Afiesere Field OML30
Project Description—SectionalReplacement on the 2” Gasilift lines (Afie 41S, 7L, 4L,) and Afie 7S Flowline at Afiesere Field in OML30
Project Duration— Job completed on scheduled and handed over to the
client.
Year Completed- 2016.
2,
Client—NPDC
Site Otegele in OML-30
Project Description—SectionalReplacement Repair works of the damaged section of the 28” Transforcados pipeline at Otegele in OML30
Project Duration—Job completed on scheduled and handed over to the
client.
Year Completed- 2016.
Og Client—HERITAGE
Site – Kokori in OML-30
Project Description—Leak Repair (Clamping W/39T of 2” Gas Lift Line at Kokori in OML30 CVB
Project Duration—Job completed on scheduled and handed over to the
client.
Year Completed- 2017.
Client—HERITAGE
Site – Otegele Axis in OML-30
Project Description—Leak Repair (Clamping Of Bunkery Installed Valves) of 28” TFP Along Otegele Axis in OML30
Project Duration—Job completed on scheduled and handed over to the
client.
Year Completed- 2017.
% Client—HERITAGE
Site – Oleh Field Logistics Base in OML-30.
Project Description—Provision f Computer Consumables And Office Equipment For Oleh Field Logistics Base in OML-30
Project Duration—Job completed on scheduled and handed over to the
client.
Year Completed- 2017.
Client—NPDC
Site – Emede Community in OML30
Project Description—SectionalReplacement of Vandalized 16” and Crude Oil Recovery/Evacuationon Uzere — Eriemu Manifold Trunk Line at
Emede Community in OML30
Project Duration— Job completed on scheduled and handed over to the client.
Year Completed- 2015.
Client—NPDC
Site – Ubeji Community in OML-30
Project Description—Leak Repair Works (Installation Of 1Nos 24” By 28” Plidco Clamp) On 24” TFP at Ubeji Community in OML30
Project Duration—Job completed on scheduled and handed over to the
client.
Year Completed- 2015.
Client—NPDC
Site – Odidi Axis In Eresigbene And Debirin Batan Community in OML-30 Project Description—SectionalReplacement and Leak Repair (Clamping
of bunkery installed valve on two (2) points) On 28” TFP Delivery Line along Odidi Axis In Eresigbene And Debirin Batan Communities in
OML30
Project Duration—Job completed on scheduled and handed over to the
client.
Year Completed- 2016.
Site — Ugbokodo Okpe Community in OML-30
Project Description—Leak Repair (Clamping of bunkery installed valves of the 24” TFP Delivery Line at Ugbokodo Okpe Community point B in OML30
Project Duration—Job completed on scheduled and handed over to the client.
Year Completed- 2016.
Client—HERITAGE
Site — Olomoro in OML-30
Project Description—Provision f Personnel for House Keeping and Grass Cutting Services at Olomoro/Oleh Flow Station in OML30
Client—HERITAGE Site -OML-30 Operation
Project Description—Provision f Vacuum Truck Services in Oweh, Afiesere, Olomoro, UPS, Evwereni, Eriemu,Kokori etc in OML30 Operations.
o, Client—HERITAGE
Site -OML-30 Operations
Project Description—Provision f Emergency crane Services in OML30 Operations.
Client—HERITAGE
Site -OML-30 Operations
Project Description—Provision f Hydrocarbon Accounting Support Services at Oleh Field Logistics Base in OML30 Operations.
Client—HERITAGE
Site -OML-30 Operations.
Project Description—Provision f Operations and Maintenance Services in FLB AGO Dispensing Facility in OML30 Operations.
OO oe Client—HERITAGE
Site -OML-30 Operations.
Project Description—Provision f Surveillance and Grass Cutting Services on Oweh Delivery line (2.7km) Right of Way in OML30 Operations.
Client—HERITAGE
Site – Oweh Well 5L in OML-30.
Project Description—Provision f 50 Ton Crane for the Installation of 3” Cameron SSV at Oweh Well 5L in OML30.
OG
Client—HERITAGE
Site -OML-30 Operations.
Project Description—Intervention rovision of Fund for Rental of ET Diagnostic Tools and 2Nos ET Technician for Diagnosis and Repair of Olomoro Compressor #1 & 2 in OML30 Operations.
Client—HERITAGE
Site -OML-30 Operations
Project Description—Provision f Heavy Duty Batteries for Start-Up Pumps and Generators in OML30 Operations.
Client—HERITAGE
Site -Oleh FLB OML-30 Operations
Project Description—RoutineMaintenance and Intervention (Supply of Stationaries/Office Equipments) at Oleh FLB.
oo Client—HERITAGE
Site -OML-30 Operations
Project Description—Intervention rovision of Material (Armoured Cable and Electrical Materials for Hook-Up and Start-Up Of Evwereni Export
Pumps in OML30 Operations.
Client—HERITAGE
Site -OML-30 Operations
Project Description—provision f Fumigation Services at Kokori Flowstation and Compressor Station, Ughelli Pump Centre, Eriemu Flowstation and Compressor Station,Uzere Flowstation and Compressor Station.Olomoro Flowstation and Compressor Station in OML30
Operations.
Client—HERITAGE
Site -FLB Oleh OML-30 Operations
Project Description—Completion nd Renovation of Administrative and Staff Quarters at FLB Oleh in OML30 Operations.
Client—HERITAGE
Site -FLB Oleh OML-30 Operations
Project Description—Building f AGO Facilities in FLB Oleh in OML30 Operations.